RESPONSIBLE AGENCY tuceb (Technical University of Civil Engineering Bucharest)
RESPONSIBLE FOR METADATA tuceb (Technical University of Civil Engineering Bucharest)
CURRENT STATION CONFIGURATION bucu00rou_20220729.log
STATUS IN EPN included since 21-02-1999
LAST AVAILABLE DATA 23-04-2024
LAST RECEIVER LEICA GR50 (29-07-2022 to now)
SET TO TRACK GPS+GLO+GAL+BDS+SBAS
LAST ANTENNA LEIAR25.R4/LEIT (06-10-2020 to now)
INDIVIDUAL CALIBRATION(S)
  • LEIAR25.R4/LEIT (SN: 726369) from 2020-10-06 to now :
  • LEIAT504GG/LEIS (SN: 200456) from 2008-10-31 to 2020-10-06 :
DATA ROUTINELY ANALYSED BY BEV, BKG, RGA, SGO, WUT
INCLUSION IN OTHER NETWORK(S) IGS, EPOS

The RINEX 2 data are no more submitted to the EPN data centres since 06-10-2020.

RINEX V2.11 - GPS+GLO
Daily
(data calendar)
Data centres Online Last data Availability Download
EPNCB (historical) 279/2020 N/A
BEV 023/2020 N/A
BKGI 280/2020 N/A
RINEX V3.04 - GPS+GLO+GAL+BDS+SBAS
Daily
(data calendar)
Data centres Online Last data Availability Download
EPNCB (historical) 108/2024 78.57%
BEV 114/2024 100%
BKGI 114/2024 100%
Hourly

No recent data available

Hourly
Data centres Online Last data Availability Latency
BEV 115/2024 (V) 100% 95.83%
BKGI 115/2024 (V) 100% 65.48%

Daily and Hourly Latency Plots

Recent RINEX file errors detected by BKG data centre: web page, API (JSON format)

BKG upload settings to other data centres.

Location

Pictures